Energized capacity without a grid queue.
Power in months, where new grid connections take four to five years.
Sovereign Point One
Where what comes next gets built.
Existing utility service. No new plant.
Capped. Reserved for what comes next.
Reinforced concrete. Heavy-load slab.
Round trip, on the fiber corridor.
Ninety seconds on Sovereign Point One. The building, the proving floor, and the pattern that follows it.
Sovereign Point One is colocation, run the way data centers run today, in a standing commercial building with power already connected. Leased space and power carry the building. A corner of it is reserved for what comes next.
One building. 5.5 MW. A promise to show the work. The aim is simple and measurable: more compute per watt.
Leased space and energized power in 1 to 6 MW increments. A re-rack of a standing building, not a ground-up build.
Up to 1.0 MW where partner software is measured on identical hardware, with and without. Results, not claims.
What proves here becomes a reference design, a benchmark and a playbook for the next node.
Four axes. One origin.
A former pharmaceutical plant in an established business district in Sunrise, Florida. The concrete, the slab, the air handling and the switchgear are already in place. Power is connected. First racks go live roughly sixty days after close.
| Energized power | 5.5 MW today |
|---|---|
| Utility service | 22.9 kV loop at the property line |
| Growth | Under utility study. No figure until the answer is in hand. |
| Building | 276,167 sf built 2002 |
| Structure | Reinforced concrete, heavy-load slab |
| Leasing | 1 to 6 MW increments |
| Compute | Commercially available accelerators in standard racks, standard power, standard cooling |
| Cooling | Designed for closed-loop cooling. Commitment published with the engineering. |
| Connectivity | On the fiber corridor between the Miami and Boca Raton gateways. <1 ms to NAP |
| Security posture | Single-tenant capable building for sovereign, defense, regulated and medical work |
Power in months, where new grid connections take four to five years.
American owned, Florida built. Named owners. Data stays where it runs.
A former pharmaceutical plant in an established business district, able to serve a single tenant.
On the fiber corridor between both gateways, with sub-millisecond round trip to NAP of the Americas.
A corner, not a campus. Up to 1.0 MW of SP1 is reserved for partners to prove software on real power and real workloads. Identical hardware runs with the technology and without it. The difference is measured and published.
Every result is a controlled comparison on the same accelerators, the same racks, the same power.
Engineering, power and operations support in place. Software only. No custom hardware required.
Colocation carries the building. If a technology does not prove out, the floor simply moves on to the next one.
Validated results become reference designs for every node that follows.
SP1 opens at close.
A re-rack of a standing building, not a build.
First controlled results on the proving floor.
First new rack energized on the proving floor.
Nodes orbit. Value flows. Sovereignty remains.
Select a node. Each connects back to the origin.
Standing buildings close to demand and below large-load tariff lines. No new plant, no new campus.
SP1 exports reference designs, validated technologies, benchmark standards, trained operators and playbooks.
Not before. The map grows one measured point at a time.
Sovereign means self-reliant. American owned, Florida built. SP1 pays its own way on power, carries its own data, and names its owners. It sits in an existing building, in an established business district, under 50 MW.
Registered apprenticeships, built by Broward. The people who run the floor are trained on the floor.
Quarterly open-floor days with the region's colleges. The proving floor is a place to learn, not only to lease.
The Open Ledger publishes power, water, jobs and taxes every month. The Sunrise Compact sets the terms of being a neighbor.
| Power | Monthly |
|---|---|
| Water | Monthly |
| Jobs | Monthly |
| Taxes | Monthly |
Capacity, residency on the proving floor, open-floor days, or a question about the Open Ledger. One address reaches the team.